Master plan
The option shown is the 18 m setback scheme for two basements, five podiums and 38 floors, drawn on 16 April 2026.
What the plan shows
| Element | As drawn |
|---|---|
| Towers | Two, set along the northern edge of the site |
| Clubhouse | Ground plus four floors, on the southern parcel away from the towers |
| Driveways | 11 m wide internal driveways with entry and exit at both ends |
| Setback | 18 m on the option shown |
| Open space | Two OSR parcels, 952.28 sq. m and 1,047.76 sq. m on this option |
| Road widening | 665.19 sq. m along the approach road and 362.09 sq. m along the eastern road |
The clubhouse sitting on its own parcel rather than inside the podium is the notable move here. It buys separation from the residential cores, and it means the walk from a tower lobby to the club is a real walk. Worth pacing on a site visit once the site is open.